Complete 2D/3D SuperSting Imaging System Package - 112 Electrodes

Description

All of the equipment needed for an 112-electrode system.

SuperSting Includes:
+ Instruction manual
+ SSM Android App manual
+ Office power supply and 120V power cable
+ Brainboxes USB-serial adapter
+ Wifi antenna
+ USB-C to USB 2.0 adapter
+ Android Tablet and charger with cable
+ AdapterBox for testing and ABMN outputs
+ Firmware cable
+ PC Com cable
+ Extra fuse kit
+ 12V Battery Power cable with Boost cable
+ USB memory stick with utility software and drivers
+ 112 Stainless Steel Stakes

SwitchBox includes:
+ 61-pin Male-to-male adapter cable
+ 2m extension cable for connecting to the SuperSting